ANALISIS PENJADWALAN PERAWATAN KOMPONEN KRITIS PADA TRUK DI NINJA XPRESS BANDUNG MENGGUNAKAN METODE AGE REPLACEMENT (TA 13.11.60.52)

Trianisha Ramdhayanti, LISTA and Eka Lestiani, Melia and M. Pakpahan, Hartati (2021) ANALISIS PENJADWALAN PERAWATAN KOMPONEN KRITIS PADA TRUK DI NINJA XPRESS BANDUNG MENGGUNAKAN METODE AGE REPLACEMENT (TA 13.11.60.52). Masters thesis, STIMLOG INDONESIA.

[img] Text
03. BAB I PENDAHULUAN.pdf

Download (905kB)

Abstract

ABSTRAK Ninja Xpress merupakan salah satu jasa ekspedisi yang telah memiliki cabang di berbagai kota di seluruh dunia, termasuk Indonesia. Sebagai salah satu jasa ekspedisi terbesar, Ninja Xpress tentunya memiliki frekuensi pengiriman yang padat dan dilakukan ke berbagai penjuru daerah di Indonesia. Latar belakang dilakukannya penelitian ini adalah karena frekuensi pengiriman yang tinggi oleh Ninja Xpress, namun armada hanya diperbaiki apabila telah terjadi kerusakan dan tidak memiliki jadwal perawatan yang tetap, penggunaan armada lebih banyak daripada standar yang telah ditetapkan oleh perusahaan produsen, dan biaya perawatan kendaraan yang tidak termasuk ke dalam rencana anggaran perusahaan. Tujuan dari penelitian ini adalah untuk mengetahui komponen kritis pada armada yang dimiliki oleh Ninja Xpress Bandung dan menghitung penghematan biaya komponen menggunakan metode age replacement. Penelitian ini menggunakan metode deskriptif dengan pendekatan kualitatif dan kuantitatif dengan teknik analisis data kualitatif dan kuantitatif. Teknik pengumpulan data yang digunakan adalah berupa observasi, wawancara, dan studi dokumentasi. Metode yang digunakan adalah berupa age replacement. Hasil dari penelitian ini, ditemukan bahwa yang menjadi komponen kritis pada armada truk Mitsubishi CDD Long B 9720 PCP adalah berupa ban dan kampas rem. Berdasarkan perhitungan, diperoleh waktu penggantian pencegahan pada komponen ban adalah 11000 km dengan biaya pergantian pencegahan sebesar Rp. 473.206/Km dan untuk komponen kampas rem 49500 km dengan biaya pergantian pencegahan sebesar Rp. 705.9916/ km. Kemudian, saran yang dapat diberikan kepada perusahaan adalah diharapkan perusahaan dapat melakukan perawatan pencegahan sesuai dengan usulan yang diberikan. Kata kunci: Age Replacement, Jadwal Perawatan, Pemeliharaan, Pemeliharaan Preventif, Transportasi viii STIMLOG Indonesia ABSTRACT Ninja Xpress is one of the expedition services that has branches in various cities around the world, including Indonesia. As one of the largest expedition services, Ninja Xpress certainly has a dense delivery frequency and is carried out to various regions in Indonesia. The background to this research is due to the high frequency of shipments by Ninja Xpress, but the fleet is only repaired in case of damage and does not have a fixed maintenance schedule, more fleet use than the standards set by the manufacturer, and vehicle maintenance costs that are not included in the company's budget plan. The purpose of this study was to find out the critical components in the fleet owned by Ninja Xpress Bandung and calculate the cost savings of the components using the age replacement method. This research uses descriptive methods with qualitative and quantitative approaches with qualitative and quantitative data analysis techniques. This research uses descriptive methods with qualitative and quantitative approaches with qualitative and quantitative data analysis techniques. The data collection techniques used are in the form of observations, interviews, and documentation studies. The method used is in the form of age replacement. The results of this study, found that the critical components in the fleet of Mitsubishi CDD Long B 9720 PCP trucks are in the form of tires and brake pads. Based on calculations, the prevention replacement time on tire components is 11000 km with a preventive replacement cost of Rp. 473,206 / Km and for brake components of 49500 km with a precautionary change cost of Rp. 705.9916 / km. Then, the advice that can be given to the company is that it is expected that the company can carry out preventive care in accordance with the proposals given. Key Word: Age Replacement, Scheduled Maintenance, Maintenance, Preventive Maintenance, Transportation

Item Type: Thesis (Masters)
Subjects: H Social Sciences > HE Transportation and Communications
Depositing User: Unnamed user with email [email protected]
Date Deposited: 02 Jun 2022 06:49
Last Modified: 02 Jun 2022 06:49
URI: http://eprint.ulbi.ac.id/id/eprint/853

Actions (login required)

View Item View Item