Optimalisasi Okos Material Handling Dan Waktu Produksi The Celup Walini Dengan Konsep Lean Manufacturing Di Indrustri Hilir The PT.Perkebunan Nusantara VIII (TA 13.15,19.9)

Fahmawati, Yuni and Dewi, Nurlaela Kumala and Pakpahan, Hartati M. (2019) Optimalisasi Okos Material Handling Dan Waktu Produksi The Celup Walini Dengan Konsep Lean Manufacturing Di Indrustri Hilir The PT.Perkebunan Nusantara VIII (TA 13.15,19.9). Diploma thesis, STIMLOG INDONESIA.

Full text not available from this repository.
Item Type: Thesis (Diploma)
Subjects: H Social Sciences > HE Transportation and Communications
Depositing User: Unnamed user with email [email protected]
Date Deposited: 21 Apr 2022 07:52
Last Modified: 21 Apr 2022 07:52
URI: http://eprint.ulbi.ac.id/id/eprint/710

Actions (login required)

View Item View Item